Company Details
- Entity Type
- Carrier
- Fleet Size
- 2 units
- Drivers
- 1 total
Contact Information
- Phone
- (303) 437-6824
- [email protected]
Operation Summary
- Operating Status
- Active
- Carrier Operation
- Intrastate Non-Hazmat
- Operation Classification
- Private Property
- Cargo Carried
- Machinery Large, Construction
- Annual Mileage
- 10,000 miles (2026) as of Mar 11, 2026
Physical Address
857 S VAN GORDON CT #C103LAKEWOOD, CO, 80228
US
Mailing Address
857 S VAN GORDON CT #C103LAKEWOOD, CO, 80228
US
Fleet Details
| Vehicle Types | Owned | Term Leased | Trip Leased |
|---|---|---|---|
| Trucks | 2 | 0 | 0 |
Safety Violations
| Total | Severe | Out of Service | Measure | Percentile | |
|---|---|---|---|---|---|
Accident Reports
Results for 24 months prior to Jun 12, 2026
| Last 6 Months | 6-12 Months ago | 12-24 Months ago | Total | |
|---|---|---|---|---|
Inspections
Results for 24 months prior to Jun 12, 2026
| Driver | Vehicle | Hazmat | IEP | |
|---|---|---|---|---|
Safety Rating
- Rating Date
- None
- Rating
- None
- Review Date
- None
- Type
- None
Company Details
- Entity Type
- Carrier
- Fleet Size
- 2 units
- Drivers
- 1 total
Physical Address
857 S VAN GORDON CT #C103LAKEWOOD, CO, 80228
US
Contact Information
- Phone
- (303) 437-6824
- [email protected]
Mailing Address
857 S VAN GORDON CT #C103LAKEWOOD, CO, 80228
US
Operation Summary
- Operating Status
- Carrier Operation
- Operation Classification
- Cargo Carried
- Annual Mileage
- Active
The entity's USDOT number is active. - Intrastate Non-Hazmat
- Private Property
- Machinery Large, Construction
- 10,000 miles (2026) as of Mar 11, 2026
Fleet Details
| Vehicle Types | Owned | Term Leased | Trip Leased |
|---|---|---|---|
| Trucks | 2 | 0 | 0 |
| Total | Severe | Out of Service | Measure | Percentile | |
|---|---|---|---|---|---|
| Last 6 Months | 6-12 Months ago | 12-24 Months ago | Total | |
|---|---|---|---|---|
| Driver | Vehicle | Hazmat | IEP | |
|---|---|---|---|---|
Safety Rating
This is a measure of the carrier's compliance with the Federal Motor Carrier Safety Regulations (FMCSR). A Compliance Review is a statistical sampling or audit of required records to determine a motor carrier's compliance with the FMCSR. An in-depth review of the motor carrier's records is made to check different categories of drivers, vehicles and trips. This review may be limited to specific problems and may include a detailed investigation of a problem area. The compliance status determination is based on FMCSR violations discovered during the review. The below safety rating information is based on SAFER Web data. Hey Bubba! updates these statistics as they are released by the FMCSA.
This is a measure of the carrier's compliance with the Federal Motor Carrier Safety Regulations (FMCSR). A Compliance Review is a statistical sampling or audit of required records to determine a motor carrier's compliance with the FMCSR. An in-depth review of the motor carrier's records is made to check different categories of drivers, vehicles and trips. This review may be limited to specific problems and may include a detailed investigation of a problem area. The compliance status determination is based on FMCSR violations discovered during the review. The below safety rating information is based on SAFER Web data. Hey Bubba! updates these statistics as they are released by the FMCSA.
- Rating Date
- Rating
- Review Date
- Type
- None
- None
- None
- None
More Trucking Resources
The carrier profiles listed on this page are compiled by Hey Bubba! based on publicly available data from the Federal Motor Carrier Safety Administration (FMCSA), including sources such as SAFER Web and the FMCSA's Safety Measurement System (SMS). While we strive to provide accurate and up-to-date information, Hey Bubba! does not guarantee the completeness, accuracy, or timeliness of the data presented. Users are advised to verify any critical information directly with the FMCSA or the carrier in question. Hey Bubba! assumes no legal liability or responsibility for any errors, omissions, or outcomes resulting from the use of this information.